Page 23 - 1.HTAIn_Process_Manual
P. 23

Figure 5. Topic Selection Activities


                 2)  Technical Partner/ Resource Centre Consultation
                 Objective:  To  identify  the  potential  technical  partner(s)/  Resource  Centre(s)  and

                 allocate the topic(s) for HTA analysis based on a consultative process.
                 Activities:

                    HTAIn Secretariat identifies the TP/ RRC and may seek guidance from the TAC

                      in their identification.

                    HTAIn Sec. will inform the TP/ RRC about the selected topics through email or

                      formal letter.

                    After  agreement  of  topics  between  secretariat  and  TP  the  TP  will  submit  a
                      proposal to carry out HTA on the selected topic in a prescribed format.

                    Secretariat will review the proposal according to the methods manual/ reference

                      case  for  initial  screening  and  proposals  and  the  proposal  will  be  sent  to  the

                      technical appraisal committee (TAC) for evaluation at least one week before the

                      TAC meeting.

                    TP/RRC will present the proposal before TAC in the TAC meeting conducted by
                      the Secretariat in DHR.






                                                                                                      22 | P a g e
   18   19   20   21   22   23   24   25   26   27   28